MULTIROCK installation: 2x ECOROCK-5000 package wastewater treatment plant


Our client is the largest quarry site in the UK. The BIOROCK sewage treatment plant is servicing an office block with 100 persons and a canteen. The effluent is pumped from 3 sources over several hundred metres to the septic tank.

This MULTIROCK installation is composed of 2 x ECOROCK-5000 sewage water treatment units above ground after an existing septic tank.


Project images